A MHB Badger Breaker® completed 58,000 square yards of concrete pavement break and seat in 6 shifts. One lane of existing asphalt overlay was milled and windrowed in the other lane, the pavement was broken and seated, and the millings were pulled back all in the same day.
Stagecoach Road, north of Dansville, Livingston County, New York, USA
7"-8" thick JRCP
4.5" thick asphalt overlay on 6" thick crushed aggregate on double chip seal on 10" thick asphalt millings
Summer, 2011