Cracked 142,000 square yards of concrete pavement with a T8600 Badger Breaker® with a 24″ strike spacing. Note the spider web of cracks visible after some rain in the lane that has been cracked as compared to the lane not yet cracked.
USH 14, Pierre, Hughes County, South Dakota, USA
8" thick JPCP
3.5" thick asphalt overlay
August, 2013