DeKalb County, Illinois, USA

Waterman Road, n/o Waterman, IL

 

Antigo used a MHB Badger Breaker® to crack an old 11′-wide concrete pavement after the existing asphalt overlay was milled off and windrowed on the shoulder. The cracked concrete was seated with a pneumatic-tired roller and then the asphalt millings were bladed back over the concrete as a base for the new aggregate layer with a bituminous surface treatment.
 

 

View Crack & Seat Media

Project Details

Location

Waterman Road, n/o Waterman, DeKalb County, Illinois, USA

Existing Pavement

5" to 7" thick JPCP with 5" thick asphalt overlay

New Pavement

6" aggregate surface course and bituminous surface treatment

When

June, 2017

Project Photos