Rubblized 5,475 square yards of concrete pavement on CTH R with an MHBT Badger Breaker®. Antigo rubblized the first lane and the Brown County Highway Department overlaid it with asphalt immediately with traffic maintained in the adjacent lane. The second lane was completed similarly the same day.
CTH R, from n/o Devils River Trail to s/o CTH KB (Depere Rd), Brown County, Wisconsin, USA
9" thick JRCP
3.5" thick asphalt overlay
Rubblization completed in 1 work day in August, 2020