A T8600 Badger Breaker® completed 67,000 square yards of concrete pavement crack and seat prior to asphalt overlay. The work was completed in two days. After a light rain began to dry up, the induced cracking pattern was visible.
E64, s/o Tama, Iowa County, Iowa, USA
6" thick JPCP
7" thick asphalt overlay
September, 2020