Rubblized 130,000 m2 of concrete pavement built on sandy soil over 70 years ago. Finished the job in 8 working shifts. This was the first ever rubblization job in Northwest Poland.
Highway DW 142, e/o Szczecin, Poland
8"-10" (200-250mm) JPCP and JRCP
4" (100mm) aggregate layer and 9.4" (240mm) asphalt overlay on top of rubblized layer.
June, 2017