Rubblized 355,000 square yards of extremely hard concrete pavement in only 33 days operating 2 to 3 MHB Badger Breakers®. Timing was critical as the paving contractor had a very aggressive schedule and was paving close behind the rubblization operation.
I-15, Beaver, Beaver County, Utah, USA
10.5" thick JRCP over 6"-10" thick asphalt
7.5" thick asphalt overlay
Summer, 2014