Audubon County, Iowa, USA

F58 (Littlefield Dr), 300th St to 350th St, IA

Rubblized 73,376 square yards of concrete pavement on county highway F58 with a MHB Badger Breaker® utilizing a modified rubblization pattern to rubblize the upper layer of concrete only. A 2″ thick layer of choke stone was placed on the rubblized concrete prior to placing the asphalt overlay.

View Rubblization Media

Project Details

Location

F58 (Littlefield Dr), 300th St to 350th St, Audubon County, Iowa, USA

Existing Pavement

5" thick JPCP over chip seal over 6" JPCP

When

June, 2016

Project Photos