Rubblized 232,029 square yards of thick airfield concrete pavement operating 8600 Badger Breakers® to pre-break the concrete and MHB Badger Breakers®. The Phase III portion of this runway reconstruction project required accelerated construction so Antigo operated three 8600’s and two MHB’s up to fourteen hours per day for five days to complete 73,000 square yards of rubblization per the contractor’s schedule. The rubblized concrete surface was milled down 2 inches to reduce the elevation change of the asphalt overlay.
Runway 15-33, Griffiss International Airport, Rome,, New York, USA
14"-17” JPCP
12 days in May & June, 2020 and 5 days in September, 2020