Rubblized 51,000 square yards of concrete pavement in only 5 days with an MHB Badger Breaker® and grid roller. This Design-Build project took advantage of the efficient construction aspects of concrete rubblization and asphalt overlay and will see the benefits of excellent pavement performance in the future.
SR 21, e/o Doylestown, Wayne County, Ohio, USA
9" thick JRCP
7.25" thick asphalt overlay
First phase in September, 2024, with second phase in 2025