Central Wisconsin Airport, Mosinee, WI, Break Concrete for Removal with MHB

Breaking for removal a 13” thick, jointed plain concrete pavement (JPCP) at Central Wisconsin Airport using a MHB Badger Breaker® with a wide hammer cage (12.5 feet). The broken concrete was crushed on site and used as subbase for the new concrete pavement surface.