Videos Rubblization Controlled-Access Highways
Jun 29, 2016
Rubblization of 10″ thick, jointed reinforced concrete pavement in preparation for a new asphalt overlay on I-70 in Fayette County, IL, performed by Antigo Construction using a MHB Badger Breaker®, Z-pattern grid roller, pneumatic-tire roller and a vibratory smooth drum roller in 2015. Traffic was maintained in adjacent lane as rubblization and asphalt overlay were performed in one lane at a time. 26 lane miles were rubblized in 19 work days.