Antigo Construction breaking for removal 10″ thick, jointed reinforced concrete pavement (JRCP) on USH 380, Collin County, TX using two 8600 Badger Breakers®. The 8600s broke the concrete into 10″ minus size particles using a 6″ strike spacing. The broken concrete was loaded into off road dump truck and hauled away for recycling. 66,000 square yards of concrete was broken for removal in 6 days.